Abstract

Recent development in membrane manufacturing and extensive application of membranes in effluent treatment has opened up a new water resource. The effluent pretreatment module plays a critical role in membrane performance. Appropriate selection of conventional and advanced pretreatment modules in membrane separation processes (MSP) is significant to the success of zero effluent discharge (ZED). This study addresses performance assessment of eight conventional and advanced pretreatment modules implemented for wastewater management in a textile cluster in South India. The comparative pollutant reduction, capital, operation and maintenance (OM) cost of pretreatment modules are discussed. The ranking and interdependence of the pretreatment modules were analyzed through fuzzy analytical hierarchy process (FAHP) with MATLAB software. The pretreatment module IV ranked third with a composite weight of 15.46%. The integrated study of performance assessment and FAHP resulted in an optimum pretreatment module IV comprising the sequence of chemical precipitation, bio-oxidation processes (activated sludge processes) followed by chemical precipitation, to achieve the ZED. This study provides a techno-economically feasible solution for selection of an effective pretreatment module for MSP in the textile cluster.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.