Abstract
Aims: Node-link mapping (NLM) has been strongly advocated as a cognitive tool that aims to enhance the treatment process and is supported by a large evidence-base. In one local authority area in England, NLM was systematically introduced and embedded into staff daily practice across five main services including non-statutory, NHS and young people’s services. The study aimed to assess training and adoption of NLM prior to implementation into daily practice. Methods/Results: In total, 123 staff members were trained in NLM concepts across a number of workshops. Staff responses were recorded in a Workshop Evaluation Survey that suggested a high degree of satisfaction with the training provided although “time” was identified as a pre-requisite to prepare for implementation. A random sample of staff (n = 44) were followed-up at 6 months and were asked to complete a Workshop Assessment Follow-up schedule alongside participation in focus group interviews. Despite a commitment to NLM, there were mixed perceptions into the efficacy of node-link mapping. Staff concerns focused on lack of perceived ownership of the implementation process and a lack of confidence in using mapping on a regular basis. Managers also reflected reservations with “traditional” training methods and how to incorporate new practices into supervision processes. Implications for the dissemination of evidence-base practices are discussed.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.