Abstract

The use of Pre-Construction Services (PCS) is becoming increasingly common internationally. What remains unclear is defining the optimal stage to engage it. This paper adopted complexity factors to find the optimal moment to engage in PCS. From literature, the factors: schedule-pressure, risk, financing, and technicality were adopted as factors of complexity. Understanding these factors for PCS can help the industry avoid costly PCS pitfalls of engaging in PCS too early or too late. With an online survey, a series of interviews and the analytical hierarchy process, this paper has weighed the above four factors for the key construction stakeholders. This paper concludes that schedule pressure is the most important factor, while technicality is the least important factor for deciding when to engage in PCS. Using these factors and respective weights, it is recommended that a tool be developed that can assist the industry in determining when to engage the contractor for PCS.

Highlights

  • Construction projects are becoming more sophisticated and as a result, early involvement of the contractor in the project life cycle is becoming more common

  • This paper seeks to extend the work of van der Walt et al in clarifying the timing of Pre-Construction Services (PCS) in the New Zealand construction industry and provide confidence to clients as to when contractor involvement is best suited in the preconstruction phase

  • The validity of the results obtained was verified through the Analytical Hierarchy Process (AHP) consistency ratio (CR) check

Read more

Summary

Introduction

Construction projects are becoming more sophisticated and as a result, early involvement of the contractor in the project life cycle is becoming more common. It provides the client and designers with access to Pre-Construction Services (PCS) from the contractor; this allows for constructability advice, risk identification, and mitigation, plus a review of the construction budget (Rahmani et al 2013, Song et al 2009). This paper seeks to extend the work of van der Walt et al in clarifying the timing of PCS in the New Zealand construction industry and provide confidence to clients as to when contractor involvement is best suited in the preconstruction phase

Methods
Results
Conclusion