Abstract

While construction projects continue to grow rapidly every year, the industry still faces challenges in the form of underperformance as the result of inefficient project management. This is reflected in low productivity and cost and time overruns for construction projects. Better planning and scheduling are important in order to increase the success of construction projects. This study aimed to investigate factors influencing scheduling activities of construction projects in Indonesia. A systematic literature review was performed, leading to the identification of twenty factors influencing scheduling activities at the planning stage and twelve factors influencing scheduling activities at the implementation stage. Questionnaire surveys were distributed to obtain the primary data in this study. Following data collection, factor analysis was conducted to discover comprehensive underlying concepts influencing scheduling activities. Six groups of factors influencing scheduling activities at the planning stage and three groups influencing scheduling activities at the implementation stage were identified. These findings were synthesized to develop a framework. Therefore, this study contributes by identifying key factors influencing scheduling activities in both planning and implementation stages through factor analysis within a context-specific environment and presenting the scheduling-dispute framework as a practical tool for managing delay-related disputes that may arise due to these factors. Construction professionals can take advantage of this study to implement better scheduling practices and minimize construction disputes; such improvements ultimately lead to project success.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call