Abstract

Industrialized Building System (IBS) is a form of construction with focused processes comprise of methods, products and a set of connected components which work together to achieve objectives. The Malaysian construction industry is one of the contributors towards the development of the country. To ensure the vitality of construction performance, utilization and application of IBS is the right system to shift to from the current conventional construction method. The adaptability of IBS in Malaysia’s construction industry is very low due to various limitations and barriers. To better understand IBS, this paper performs a systematic review of studies underpinning the factors influencing IBS success. From a total of 111 articles reviewed in this paper, 16 factors were highly mentioned, such as knowledge and expertise, cost of construction, training, Communication, Lean Construction, Government Policies, Contractors’ Satisfaction, Integration of Resources, Utilization of Software, Market Factor, On-site Management, Technical factor, Integrated Processes Assessment, Management Factor, Payment Issues, and Employee Empowerment. These factors significantly influence IBS project performance

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.