Abstract
The lacks of local workforce supply become a problematic in Malaysian construction industry. Meanwhile, HRP is important during workforce supply to help organizations in order to appoint the right people in the right job. This paper reports on the use of factors influencing HRP towards local workforce supply in the construction industry in general, and Malaysian construction in particular. Semi structured interviews were conducted to 10 interviewees from the government and non-government organizations to investigate current issues of local workforce and the practices of HRP in the construction organization. The analysis methods were based on descriptions of previous tested research. The findings reveal that the lack of local workforce is due to low wages system, safety issues, educational changes, low status and unsecured work, environment in construction industry, developments and technologies changes in Malaysia. The internal factors of HRP were practiced among construction organization are organization strategy, organizational culture, organization changes, leadership and experience, nature of work and empowerment of labor. Meanwhile, the external factors are technology changes, economic changes, legislation and demographic changes. The paper provides valuable information on the practices of factors influencing HRP for local workforce supply in Malaysian construction industry.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Construction Engineering and Project Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.