Abstract

Although less than 100 mm of precipitation generally falls during the winter months in the upper Ürümqi River basin, an uneven snowpack of 20 to 100 cm depth is present in early spring. When the surface of this snow cover begins to melt in April, the meltwater is not immediately transformed into streamflow. Several processes are responsible for the five to 15 days of delay in streamflow generation: refreezing in the snow cover itself, creation of a basal ice layer at the snow-soil interface, growth of superimposed ice on the glaciers of the basin, ice formation in stream channels and restoration of high albedo by snowstorms that occur about once a week in spring.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call