Abstract

Material cost is almost 50-60% of most construction projects. A better material management contributes to lesser cost for a project and also, sustainable use of available resources in the long run. This project aims to identify the major factors affecting material management in a construction project. The various factors at different stages of material management are identified and put in a form of a questionnaire. The responses to the questionnaire were obtained from the stakeholders such as architect, storekeepers, material managers, quantity surveyors, site engineers, project managers, and project engineers. The relative importance of each factor is arrived at based on the ranked response obtained from questionnaire survey. Among the factors identified, the factor ‘unclear definition of roles and responsibilities’ is ranked as the major factor that affects material management.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call