Abstract
Imperfect maintenance planning was frequently identified in domestic nuclear power plants. To prevent such an event, we analyzed causal factors in maintenance planning stages and showed the directionality of countermeasures in this study. There is a pragmatic limit in finding the causal factors from the items based on report descriptions. Therefore, the idea of the systemic accident model, which is used to monitor the performance variability in normal circumstances, is taken as a new concept instead of investigating negative factors. As an actual method for analyzing usual activities, cognitive task analysis (CTA) was applied. Persons who experienced various maintenance activities at one electric power company were interviewed about sources related to decision making during maintenance planning, and then usual factors affecting planning were extracted as performance variability factors. The tendency of domestic events was analyzed using the classification item of those factors, and the directionality of countermeasures was shown. The following are critical for preventing imperfect maintenance planning: the persons in charge should fully understand the situation of the equipment for which they are responsible in the work planning and maintenance evaluation stages, and they should definitely understand, for example, the maintenance bases of that equipment.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Transactions of the Atomic Energy Society of Japan
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.