Abstract

. A good facility layout will affect sustaining the smoothness of the production process. initial observation on a current CV. NTY is still not good to apply because it does not take into account the degree of proximity. This can be seen from machine laying as well as workstations that look distanced as well as the flow of intersecting material resulting in backtrackings, such as the blowing department towards the cutting department its material removal distance of 23.2 m and having to go through the packing department and plong department with too much distance and intersect caused the production time to become longer. The methods that production facility layout design uses on the CV. NTY is Systematic Layout Planning and Blocplan methods. This method was chosen because it conforms to the company's characteristics and can minimize the distance between production stations as well as no more intersecting production process flow. This study was conducted to find out and obtain improved material distance efficiency in handling the preliminary layout with the proposed layout. The results of the study show the blocplan method has a total decrease in the displacement distance smaller by 60.73 m with an efficiency increase of 42 % as well as improving the flow of the production process in the initial layout.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.