Abstract

This paper solves a strategic-level decision problem on determining the optimal location of (re)manufacturers and logistics centres with the consideration of facility scales in an integrated closed-loop supply chain network. A two-stage stochastic mixed-integer non-linear programming model is established to minimise the fixed cost and the expected operation costs under uncertain demand and return. We develop an improved tabu search heuristic algorithm to solve the model. We also design a distance-based decision rule to validate the effectiveness of the proposed model. Numerical experiments are conducted to test the performance of the proposed model and the solution method. In addition, sensitivity analysis is provided to investigate the influences of varying inspection locations and recovery rates on the final performance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.