Abstract

The design layout of industrial facilities has a great impact on its workflow success. The following study assesses a factory specialized in the manufacture of various brass accessories using the 4.0 industrial context to condition its operation process. The studied industrial facility was experiencing performance difficulties due to a coordination malfunction between operations, which leads to a recurring delay in the Assembly department. In addition to the unproductive activities occurring because of the delay. To address this situation, the study proposes a new facility layout using a combined lean manufacturing approach using CORELAP algorithm and simulation. This new approach results in the daily increase of overall production efficiency.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.