Abstract

This study investigates solutions for facade renovation of general office buildings built between 1960 and 1980 in the Copenhagen Municipality. 44 buildings are used for the study. They share common structural and construction principles like the use of beams and columns and prefabricated elements. The problems that face these buildings are a high number of overheating hours and high heating consumption. Four strategies are tested for the renovation: external re-insulation, double-skin facade (existing inner facade), double-skin facade (new inner facade) and curtain wall. External re-insulation and curtain wall provide the best results for reducing the energy consumption for heating.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.