Abstract

Estimating effort is an essential prerequisite for the wide-scale dispersal of ontologies. Not much attention has yet been paid to this essential aspect of ontology building. To date, ONTOCOM is the most prominent model for ontology cost estimation. Many factors influencing the building cost of an ontology are depicted by linguistic terms like Very High, High, . . . and so on; making them vague and indistinct. This fuzziness is quite uncertain and must be taken into consideration. The available effort estimation models do not consider the uncertainty of fuzziness. In this work, we propose an effort estimation methodology for ontology engineering using Fuzzy Logic i.e. F-ONTOCOM (Fuzzy-ONTOCOM) to overcome of uncertainty and imprecision. We have defined the corresponding Fuzzy sets for each effort multiplier and its associated linguistic value, and represented the same by triangular membership functions. F-ONTOCOM is applied to a dataset of 148 ontology projects and evaluated over various evaluation criteria. FONTOCOM outperforms the existing effort-estimation models; it has been concluded that F-ONTOCOM improves the cost estimation accuracy and estimated cost is very close to actual cost.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.