Abstract

Software cost estimation is a key open issue for the software industry, which suffers from cost overruns frequently. As the most popular technique for object-oriented software cost estimation, Use Case Points(UCP) method, however, has two major drawbacks: the uncertainty of the cost factors and the abrupt classification. To address these two issues, we propose the Extended Use Case Points (EUCP) method. With a probabilistic cost model constructed from integrating fuzzy set theory and Bayesian Belief Networks(BBNs) with the UCP method, EUCP provides a probability distribution of cost and a refined gradual classification, which mitigate the uncertainty of cost factors and improve the accuracy of classification. In this paper, we provides two case studies to demonstrate the effectiveness of EUCP in the real life.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.