Abstract
Boiling water reactors (BWRs) in the United States have transitioned over the past 30 yr from 7 × 7 and 8 × 8 fuels, 12-month cycles, and batch average burnups of 30 GWd/tonne U to 10 × 10 fuel, 18- to 24-month cycles, batch average burnups of 50 GWd/tonne U, and 5% power uprates in the 1990s. The next step for BWRs in the new millennium is 24-month cycles and extended power uprates as high as 120% power. These operating conditions lead to large reload fuel batch sizes (up to 45% of the core) that result in lower batch average discharge burnups (~45 GWd/tonne U). Parameters driving the drop in fuel burnup include enrichment limitations and the need for fuel performance improvements. The next steps to achieve better BWR fuel cycle economics and their associated benefits and implementation challenges are discussed in this paper.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.