Abstract

This paper explores the viability of deep level gold mines in the Far West Rand (FWR) gold field, South Africa (SA), for underground pumped hydroelectric energy storage (UPHES). Ultra-deep, non-flooded shafts, extensive underground storage space, and abundance of water from an overlying karst aquifer make gold mines in the FWR exceptionally suitable for UPHES. With generating capacities ranging from 0.5 to over 1.5Gigawatts per plant, UPHESs are not only of potential significance to local gold mines suffering from frequent power cuts, but also for closing the peak load shortfall of the national grid as well as for storing surplus energy from the rapidly growing renewable energy sector. Furthermore, UPHES systems are able to avert large future expenditure for post-closure mine water management by preventing the flooding of mine voids in an ecologically and economically sustainable manner. Moreover, UPHES provides two of the most critical elements for a successful post-closure development of former mining towns: energy and water. It protects scarce water resources in the semi-arid region and generates peak-demand electricity. Using an example of a gold mine located in the water-rich part of the FWR, this study found that UPHES is both, technically feasible and economically viable. It is strongly recommended to conduct a more detailed follow-up study as a base for establishing the world's first reference plant in SA.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.