Abstract

Speed-driven projects require extensive planning and coordination for their successful execution within the specified time and cost. With an increasing demand for flash track execution, more efficient ways for project implementation is needed. Lean construction is having a profound impact on the construction industry, which is perceived to be suffering from cost and schedule overruns. This review paper investigates the use of various lean tools and principles in flash track projects and if there is any synergy between lean and flash track projects to improve productivity and schedule performance. Through rationalizations and with the help of case studies and theoretical evidence found in literature, eleven lean tools and eight lean principles have been analyzed for their synergy with flash track construction. The results indicate that all except one lean tool (Just in Time) and one lean principle (reduce inventory) facilitate successful implementation of flash track project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.