Abstract

Mechanical and Electrical (M&E) services costs constitute a substantial proportion of the total cost of a building. Realistic cost estimates for this element are a desirable option by industry stakeholders because the total building cost can potentially be reduced if the cost of M&E services can effectively be managed throughout the life of the project. In the building construction industry, quantity surveyors are engaged to prepare cost estimates on all aspects of the building and provide cost advice services at every stage of the building construction projects. However, M&E services are one aspect of a building that quantity surveyors find very difficult to prepare cost estimates for. This study explored the role of quantity surveyors and, the challenges involved in the delivery of M&E services cost estimation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.