Abstract

The existing roads, railways can no longer meet the growing expansion of the traffic needs, some newly built roads, railways must be crossed with the old lines, the difficulty of construction is considerable, especially Pro tight both line and rock blasting operations, it is necessary to consider boththe safety of the line, but also to ensure that the construction schedule. Based on an example of the rebuilding of the railway grade crossing to interchange from Loudi Prefecture in Zhuliu highway to dragon section of the sand Huaihua, Hunan Province, the article describes the safety and protection measures construction blasting in conditions close to the complexity of the existing lines, the construction of similar projects the organization, management provide some reference.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.