Abstract

The recently experienced hype concerning the so-called “4th Industrial Revolution” of production systems has prompted several papers of various subtopics regarding Cyber-Phdysical Production Systems (CPPS). However, important aspects such as the modelling of CPPS to understand the theory regarding the performance of highly non-ergodic and non-deterministic flexible manufacturing systems in terms of Exit Rate (ER), Manufacturing Lead Time (MLT), and On-Time Delivery (OTD) have not yet been examined systematically and even less modeled analytically. To develop the topic, in this paper, the prerequisites for modelling such systems are defined in order to be able to derive an explicit and dedicated production mathematics-based understanding of CPPS and its dynamics: switching from explorative simulation to rational modelling of the manufacturing “physics” led to an own and specific manufacturing theory. The findings have led to enouncing, among others, the Theorem of Non-Ergodicity as well as the Batch Cycle Time Deviation Function giving important insights to model digital twin-based CPPS for complying with the mandatory OTD.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.