Abstract
In experiments on GIT4, a scheme with the load connected upstream from the plasma opening switch (POS) was investigated. The load was connected to the generator output through the surface self-breaking switch. The current switching into the different inductive loads was tested. It was found that the time the POS is open depends on the value of the load inductance. It was demonstrated also that surface self-breaking switch can be applied for switching currents rising at /spl sim/2/spl middot/10/sup 13/ A/s.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.