Abstract
f LBL-13190 k& •eL Experiments, Conceptual Design, Preliminary Cost Estimates and Schedules roround Research Facility G Korbin, H. Wollenberg, C Wilson. B. Strisower. T. Chan and P. Wedge September 1981 . / L a w r e n c e Berkeley l a b o r a t o r y University of California Berkeley, California 94720 Prepared for High level Waste Technical Development Branch Division of Waste Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission •minaret This work wen supported by the U.S. Department of Energy under Contract D6-AC03-76SF00098
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.