Abstract
In order to reduce the adverse effect of the blasting vibration velocity to residents in the urban subway blasting excavation construction, and made it meet the requirements of design, based on the stress concentration effect of empty hole, carried out the research of middle empty hole in parallel hole cut blasting. Adopted the technology of middle empty hole in parallel hole cut blasting, by measuring the blasting vibration velocity, the utilization rate of borehole, the half eye tracking rate, and so on, the results showed that the blasting vibration velocity of cut blasting was 0.69cm/s, the blasting vibration of expansion slot blasting was 1.27cm/s, the borehole utilization was 90%, and the half eye tracking rate of periphery holes was 90%. The test results showed that this technology could effectively reduce the blasting vibration under the residential areas in blasting excavation, the effective experiences could be used in the similar projects.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.