Abstract

Purpose of the present is to investigate the food configuration at a tunnel entrance for reducing the micro pressure wave that is generated according to train speed. Two configurations were examined for tunnel of 0.5 km length. The experimental results show that a slit cover hood installed at the entrance of the tunnel reduces the maximum micro pressure wave by 41.2%, and a configuration with a slit cover hood installed at the entrance and a 45slanted portal at the exit of the tunnel suppresses it by 47.7%.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.