Abstract

The traditional method of the offshore caisson positioning and installing is using the barge or floating crane, but for the large caisson with 26,000 tons, the method is unable to achieve apparently. In this paper, the offshore location and installation of the large caisson with mooring line system and anchor cable system are studied. The research gets the wave and flow conditions results as well as the related and advertent items, which provide the reference for large caisson positioning and installation as well as the similar engineering construction technology.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.