Abstract

The berthing structures are built with diaphragm wall tied with piles. The location of the diaphragm wall either in the front or in the rear of the berthing structure depends on the soil condition, the width of the deck, and slope formed after dredging. Instead of the diaphragm wall, the pipe sheet pile wall can be used for its high bending strength and easy construction if the soil is very soft clay or very loose sand. Two configurations with pipe sheet pile wall in the front or in the rear connected to two rows of the pile for lateral mooring pull are studied for different dredge levels. The experimental study performed in cohesionless soil for both the configurations shows that the configuration with pipe sheet pile wall in front has two times more capacity with pipe sheet pile wall in the rear.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.