Abstract

In semiconductor manufacturing, the key production criteria are a short cycle time and the maximization of the production capacity. It is known that the production capacity mainly depends on the bottleneck machines in the photolithography processes used in the fabrication process. In this paper we suggest a model to allow the testing of various policies without losing the main characteristics of the fabrication line. Efficient scheduling rules for the bottlenecks and input rules are also suggested with the objectives of maximizing the production volume under a short cycle time. We have shown that pull type scheduling rules outperform push type rules for most performance measures, and that there exists a good combination of scheduling and input rules. Experimental results also include the relationships among the cycle time, balance rate, production output and delivery performance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.