Abstract

In order to solve the problem of gas exceeding the limit in the No.3 coal seam excavation face of Huoerxinhe coalmine, the gas outburst control measure was adopted to pre-evacuate the gas by the long-distance bedding directional borehole. The results show that after 25 days of gas drainage by long-distance bedding directional borehole, the gas content of test point decreased from 13.81m3/t to 7.81m3/t, and the gas pre-pumping rate was about 43.30%. The driving speed of the main transport roadway was 1.48 times that of the traditional ordinary drilling drainage measures, and the tunneling efficiency indicators had not exceeded the standard. Through the application of this measure, it is confirmed that the long-distance bedding directional borehole can effectively reduce the drilling hole construction amount and increase the gas extraction rate, and effectively eliminate the danger of protruding, and realize the safe and rapid excavation of the coal mine roadway.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call