Abstract
Strip mining was the major method to control surface subsidence when mining under buildings in China; however, its coal recovery ratio was only 30 to 50%, resulting in a large amount of coal resource waste due to the retained strip coal pillars. As such, it is of important significance to recover the retained pillars while guarantee the safety of the buildings at surface. In order to address this issue, excavating strip coal pillars using caving zone backfill technology was proposed in this study. The process of this technology was to grouting backfill the original strip caving zones using high-water content material at first, creating a combined backfill body of caved gangue and high-water content material, the backfill body acted as the temporary support. Then the retained pillars were excavated and the newly produced caving zones were backfilled with one interval, which effectively prevented the movement and deformation of the strata. The backfilling system and technology were designed and trailed to excavate the retained pillars at mining area 911 in Bucun colliery. It was found that the backfilling rate reached 96.8 to 98.7% in the original caving zones, the backfilling body in caving zones was highly compacted, and the maximum surface subsidence was only increased to 67 mm with no growth in the failure depth of floor. The retained coal pillars in three of the mining areas were safely excavated and the safety of buildings on the ground was preserved.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.