Abstract

The total efficiency of power plants depends on energy conversion in a combustor and a turbine. Considerably higher energy transfer rates can be obtained from a pulsed combustion although unsteady flow of a single jet combustor reduces the turbine efficiency. Therefore, two pulse combustors were set in parallel and connected to a settling chamber that supplies a flow with constant pressure to the turbine. The aim of investigations presented here is a demonstration of technical feasibility for industrial applications and to show the benefits obtained from the pulse combustors.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.