Abstract

How to treat dredged sediment is one of the main environmental problems and the recycling technique is the best way to deal with this problem. This paper deals with the feasibility of beach protection project alternative materials-dredged sand, applies cement and addition to solidify it. The components of dredged sediment and the physical properties were analyzed. Specimens with a designed mix ratio of the cement and dredged sediment were made by means of instant formation. The specimens were cured under standard condition and room temperature. The unconfined compressive strength of specimens were measured after curing for 7, 14 and 28 days. Using solidified dredged sediment as construction material has advantages of technology, economy and environment protection.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.