Abstract

In this study artificial neural network (ANN) has been developed in order to estimate the electricity production of cogeneration power plant, which produces a total of 11.52 MW electric power, consisting of two V type and 12 cylinders each of which is 5.760 kW diesel engines running with heavy fuel oil no 6. In the ANN which was developed for the estimation of electric power generation of cogeneration, power plant(W), Time period (t), working hours (h), fuel consumption (m) and internal power consumption (Wp) values were used as input variables. After evaluating the performance of different ANNs, an ANN, consisting of one hidden layer and 10 neurons, was considered to be the most ideal one. As a result of the comparison with experimental data, it is concluded that this model estimates the electricity generation values of the cogeneration power plant with an R-value of 0,99073 and mean square error 4.734e-8.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.