Abstract

To research the bearing characteristics of post grouting large diameter ultra long piles under post grouting on the tip and side, the load test of three test piles of a super high rise project was carried out, and the numerical analysis method was used to research the load transfer law of post-grouting large diameter ultra long bored piles. Based on this, the differences and advantages of the post-grouting on the tip and side pile versus the non grouting pile and the pile end grouting pile are analyzed. The analytical results show as follows: post grouting on the tip and side will significantly change the performance and distribution of side friction of the piles, and improve mechanical properties of soil and pile-soil interface around piles. The ultimate bearing capacity of the post grouting on the tip and side pile foundation has increased 100% and 52% more than the non grouting and pile end grouting pile foundations. The side friction of post-grouting on the tip and side pile plays a significant difference from the non grouting piles.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.