Abstract

The first three tasks were substantially completed. The remaining two tasks are reported on: Task D, Protect Secondary Containment (missile hazard to secondary containment of 1000-MW(e) reactor), and Task E, Limit Energetics (simulation of DCA bubbles in a transparent 1/30-scale reactor vessel, and scaling laws). (DLC)

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call