Abstract
Petroleum production often involves simultaneous flow of three immiscible fluids through underground porous rock formation. In this work, we measure two- and three-phase relative permeabilities with which we examine the performance of various 3-phase relative permeability models. The rock–fluid systems used in these measurements are comprised of sandstone samples, oil (n-decane), water (Nacl, 6000ppm) and gas (nitrogen). The measurements were carried out at 23±1°C and 5.44MPa. Two- and three-phase relative permeability measurements were obtained using the steady-state technique. The three-phase experiments were conducted such that the flow rates of brine and gas were increased gradually and oil rate was decreased to simulate the reservoir behavior during primary oil production. Several different flow rate ratios were selected so as to cover the saturation ternary diagram as completely as possible. The three-phase experimental results were compared with the prediction by different models which obtained by an in-house developed three-phase software. The results showed that in the primary imbibition case, the Blunt and Baker methods are more reliable than the other methods at low gas saturations.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.