Abstract
Experimental studies have been carried out to evaluate the effect of the compaction condition at the back of block facing on the behavior of geosynthetic reinforced soil (GRS) walls. Three GRS walls with 1.2 m high were constructed at the COPPE/UFRJ Geotechnical Laboratory. The walls were well-instrumented in order to monitor the values of the reinforcement load, toe horizontal load, horizontal facing displacement, horizontal stress at the back of the block facing, and vertical displacement on the top of the walls. The behavior of the walls has been investigated at the end of construction and during the surcharge application (post-construction). At the end of the loading, the toes of the walls were gradually released to also verify the influence of the different toe restraints. The results clearly show the effect and call attention to the importance of the compaction conditions near the facing on the behavior of GRS walls.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.