Abstract

Precast building has attracted more and more interest of both researchers and engineers due to fast constructional speed and lower labour cost. In the past, the precast structure was generally used in the superstructure, such as load bearing frame, however, it is seldom applied in the substructure such as foundation. The paper thus proposed a type of pile-cap connection to fabricate the foundation of a substation. A series of tests on the prefabricated pile-cap connection using these connections were carried out under seismic loading. The failure mode and lateral load versus lateral displacement response of the tested specimens were experimentally investigated. The seismic behaviour of the precast foundation was compared with the behaviour of the corresponding cast-in-place foundation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.