Abstract

Erosion of drill pipe is very severe in gas drilling. According to the erosion theory and actual condition, the erosion of drill pipe is investigated using laboratory experiment and CFD simulation technique. Different factors of gas drilling, such as drill pipe centralization, eccentricity of drill pipe, wellbore enlargement, gas injection volume, rate of penetration (ROP) and rotational speed of drill pipe, are considered. The results show that the local erosion rate of joint is more severe than that of the drill pipe body, and local erosion rate of drill pipe in horizontal well is larger than that one in vertical well. With the increase of the eccentricity of drill pipe, wellbore enlargement and ROP, the local peak erosion rate of drill pipe would increase. The gas injection volume and the rotational speed of drill pipe have very little on drill pipe erosion. The simulation results are in good agreement with experimental data.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.