Abstract

Piled raft foundations, wherein a small number of connected piles are utilized as settlement reducers, have been widely used for high-rise buildings. Recently, a new technique has been introduced by disconnecting the piles from the raft and inserting a cushion layer between them. In such cases, the piles are considered as soil reinforcement components rather than structural members. To explore the feasibility of utilizing the disconnected piled raft foundation, a series of experimental model tests were conducted to examine the load–settlement behavior and pile load sharing ratio of the connected piled raft (CPR) and disconnected piled raft (DCPR) foundation systems using cushions of different thicknesses and stiffnesses. In addition, ABAQUS 3D finite element analyses were performed to analyze the axial stress along the piles and the bending moments along the raft. The results indicated that the total settlement of the system was minimized significantly when disconnected piles were used. In addition, the disconnected technique provided a significant reduction in the axial stress along the piles and the bending moment along the raft compared with that of the CPR. These findings may be accompanied by economic and environmental benefits.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.