Abstract

ABSTRACTMembrane cargo containment systems (MCCS) have been developed by GTT for liquefied natural gas (LNG) tanks and proved to be an efficient technology for transportation and storage of large volumes. In regard to LNG as fuel, the current aim is to introduce MCCS as fuel tanks for merchant ships. These ships will operate in areas of high traffic density. The risk of collision and grounding cannot be neglected. The latter is bound by the deformation capacity of the inner barrier of the MCCS prior to LNG leakage. In order to contribute to the understanding of the crashworthiness, a large-scale nearly four-by-four-metre mock-up was built and tested experimentally at the Hamburg University of Technology (TUHH). These experimental results serve as a validation basis for numerical crashworthiness analysis of membrane-based cargo containment systems for LNG. In both numerical analysis and experimental testing, DNV GL has been involved.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.