Abstract

In January 2003, the 10MW High-temperature Gas-cooled Reactor (HTR-10) reached its full power for continuous operation of seventy-two hours in the Institute of Nuclear Energy Technology, Tsinghua University. The reactor operated smoothlyqbthe design parameters were successfully attained. The once-through steam generator (SG) is one of key equipments of the HTR-10 reactor. The SG includes 30 modular heating helical tube assemblies. There are two thermal hydraulic requirements to be satisfied for the once-through steam generator: (1) enough heat transfer surface; (2) qualified steam can be produced under rated electrical generation power, and water-steam two phase flow un-stability can be avoided. In order to obtain the thermal hydraulic characteristics of the SG reliably, before design, a numerical code was developed for the design, and a full-scale test loop with two heating tubes as model was established, and series experiments had been carried out. The purpose of this paper is to introduce the design of SG and researches on the stability of small bending radius helical coil-pipe used in HTR-10, for exempla, the effects of outlet steam pressure, inlet water sub-cooling degree, thermal power and inlet throttling degree. Up to now, the SG has experienced full power operation smoothly, and approvingly reached its original design requirements. In the paper, some operational experimental data of the HTR-10 S.G have been presented.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call