Abstract

This paper presents the results of steady state compliance testing of phasor measurement units (PMUs) from three different vendors in a laboratory environment. Testing is performed by providing three phase voltage and current injections to the VT and CT inputs of the PMUs through Freja-300 stand-alone protection relay test set. Testing is performed according to the standard “IEEE C37.242-2013 - IEEE Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMUs) for Power System Protection and Control”. The paper discusses the test setup, testing process and overall test results of this project. The limitations of stand-alone testing equipment and recommendations for utilizing real-time hardware-in-the-loop simulation for thorough testing of PMUs are also presented.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call