Abstract

Summary Rig automation projects can benefit from the experiences developed during the successful automation of rig pipe-handling equipment. The data provided were derived from the operation and development of iron roughnecks and pipe-handling systems in the field. This paper includes a study of failure mechanisms and how they affect reliability, presents maintenance experiences to show the impact of automation on crew capability and training, and describes many operational and design pitfalls.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.