Abstract
Positive experience has been gained in using shells of heat-resistant 03Kh18Yu3BT steel with external insulation instead of shells of St3 sheet steel with an inner layer of concrete or fireclay brick for the gas-intake shafts of tract L at the Kharanor State Regional Power Plant (GRES). The new gas-intake shafts have made it possible to reduce the weight of the structure by a factor of 3 – 4 and maintenance is less complicated.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.