Abstract

AbstractThe Tunnel Albaufstieg consortium won the contract with an alternative proposal to drive a section about 2.8 km long of the 8.8 km long Boßler Tunnel with a tunnel boring machine (TBM). The next section, where squeezing conditions were forecast, was to be tunnelled by the shotcrete method according to the tender documents. Manifold and extensive additional investigations delivered the basis for the extension of the TBM drive along the entire length of the Boßler Tunnels. The driving of the section through the Aalenian 1 geology was problem free due to the low strengths and good cuttability of the rock mass combined with its impermeability. The next section in the intercalation of claystone and sandstone of the Aalenian 2 was much more differentiated but managable. The breakthrough of the east bore of the Boßler Tunnel confirms to the responsible people for the client and contractor that the decision to follow the aim of consistent mechanised tunnelling had been correct.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.