Abstract

This paper reports on the results of a series of 249 switching tests including 2 fault tests that were made on the American Electric Power (AEP) 330 km (204 miles) Jefferson to Dumont 765-kV line. Steady state and transient period overvoltages are examined and analyzed. Comparisons are made with transient network analyzer (TNA) studies performed prior to the tests. Use of nonlinear resistors to drain the trapped energy after opening the circuit is also discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.