Abstract

Abstract Well 30/6-C-26A was drilled to 9327 m measured depth in January 1995 from the Oseberg C platform in the North Sea. The well has a horizontal reach of 7853 m which is a new world record in Extended Reach Drilling, The last 2100 m were drilled horizontally in the reservoir 6 – 8 m vertically above the oil water contact. This paper will describe the planning phase as well as operational challenges experienced during drilling of this well.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.