Abstract

In order to produce pulsed electron beam with the energy of 17.5 GeV, the XFEL linear accelerator is under construction. After the assembly but before being installed in the accelerator tunnel, 100 accelerator modules have to be tested in Accelerator Module Test Facility (AMTF). Two vertical cryostats and three horizontal test benches are devoted to the testing of cavities and cryomodules as well as two other cold boxes and liquid helium (LHe) storage tank are installed to enable their operation. This paper describes our experience with cryogenic operation of AMTF after two years of operation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.