Abstract
Abstract As part of the EU project CASTOR, a 1 t/h CO 2 absorption pilot plant has been erected at Esbjergvaerket (Esbjerg power station) in Denmark. The main purpose of the pilot plant is to demonstrate the post combustion capture technology in conjunction with a coal-fired power station. Additionally, the pilot plant has been used to test the performance of new energy efficient solvents and to validate modelling work. The pilot plant operates on a slipstream of flue gas from the power plant without any further pre- treatment. During the CASTOR project, four 1000-hours test campaigns have been conducted at the facility using conventional solvent, 30%-weight MEA as well as two novel amine-based solvents, CASTOR 1 and CASTOR 2. Among others, the test campaigns consisted of parameter variation tests and longer periods of continuous operation. This paper summarises the operation experience and some of the results obtained during the CASTOR project.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.